CONCRETEIZING DERMAGA PIT
The transportation truck of Sumatran destinations crosses on the Dermaga VI Port of Merak, Banten, Monday (17/6) in the repair with concreteization. The repair is carried out to serve the trucks that are more large and long, from the maximum of 16 meters with a weight of 50 tons is now long as it reaches 20 meters with a weight reaches 90 tons so it requires a more sturdy parking area. ANTARA PHOTO/Asep Fathulrahman/ed/Spt/14
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.