INDIAN POWER

  • 20th June 2014 WIB
INDIAN POWER
A officer examined one of the turbine units in Gardu Induk PLTA Lamajan, Pangalengan, Bandung Regency, West Java, Friday (20/6). PLTA Lamajan was operated since 1925 with an installed capacity of each 6.87 MW including the business unit of the Se-Jawa and Bali electricity. ANTARA PHOTO/Novrian Arbi/s/nz.14

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
2048x1360
File size
680.41 KB
Created
20/06/2014 20:55 WIB
Photographer
Novrian Arbi
Editor