CONSTRUCTION COOPERATION OF POWER GENERATION
Recruited PT Semen Indonesia Tbk Dwi Soetjipto (second right) and Managing Director JFE Engineering Japan Tetsuo Tsuyuguchi (right) along the director of PT Semen Indonesia and Sales Manager JFE, held the traditional Japanese Daruma doll, on the signing of the manuscript of the development of power plants, in Jakarta, Tuesday (15/7). The power generation that utilizes exhaust gas (waste heat recovery power generation) with a design capacity of 30,6MW is built at a cost of reaching Rp638 billion, to reduce the use of PLN electricity by 152 million kWh and reduce carbon emissions. ANTARA PHOTO/Audy Alwi/Asf/nz/14.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.