DOWN DREDGING BRIDGE

  • 19th July 2014 WIB
DOWN DREDGING BRIDGE
Heavy equipment finishes soil dredging under the bridge slating on the Comal pantura line, Crosser, Jateng, Saturday (19/7). Dredging the ground on the North bridge to be made a temporary buffer concrete, so that H-3 is ready to go through a motorcycle and private car mud flow vehicle. ANTARA PHOTO/Oky Lukmansyah/ss/mes/14

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3600x2391
File size
1.94 MB
Created
19/07/2014 15:50 WIB
Photographer
Oky Lukmansyah
Editor