RUBBER WATER DOOR EBRATION

  • 8th August 2014 WIB
RUBBER WATER DOOR EBRATION
Worker conducts the construction of the Rubber Water Door Circular Project, Tanah Abang, Central Jakarta, Friday (8/8). The Ministry of PU targeted the construction of the inflatable water door was completed in August 2014, so that the water door can raise the flow of water from 500 cubic meters per second to 750 meters per second and expected to anticipate the preparation of the Ciliwung river water. ANTARA PHOTO/Reno Esnir/Asf/Spt/14.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
2844x1890
File size
2.07 MB
Created
08/08/2014 15:10 WIB
Photographer
Reno Esnir
Editor