INSTALLATION OF WEATHER-CONTROLLED PILE

  • 12th August 2014 GMT+7
INSTALLATION OF WEATHER-CONTROLLED PILE
The officer completed the installation of the pavement pole when the repair of the Comal pantura line bridge, the Cross, the Jateng, Tuesday (12/8). Installation of piles at four points of the Comal molor bridge due to being controlled weather due to causing Comal overflow. ANTARA PHOTO/Oky Lukmansyah/s/nz/14

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
2460x3700
File size
1.27 MB
Created
12/08/2014 17:55 WIB
Photographer
Oky Lukmansyah
Editor