COMAL BRIDGE SHORING INSTALLATION
Heavy equipment complete the installation of temporary shoring in the Comal Bridge of the pantura line, the Cross, the Jateng, Wednesday (1/10). Temporary installation of the buffer pole to strengthen the load of the bridge, in order to be able to withstand heavy vehicles that pass for the bridge test. ANTARA PHOTO/Oky Lukmansyah/ed/nz/14
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.