PREMIER PIPE ERW-2
President Director of PT Krakatau Steel Irvan K Hakim (center) runs with President Commissioner PT Krakatau Steel Zaky Anwar (left) reviewed the factory areal in the inauguration of the premier production of ERW-2 KHI Pipe Industries in Cilegon, Banten, Tuesday (14/10). With the addition of this ERW-2 facility can increase the production capacity of PT KHI Pipe Industries to 233 thousand tons/year, which is expected to encourage the performance of Krakatau Steel consolidated due to the initial stage able to absorb 50 thousand tons/year HRC products and then after fully operating its absorption reaches 120 thousand tons/year HRC PT Krakatau Steel. ANTARA PHOTO/Asep Fathulrahman/Rei/ama/14.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.