CONSTRUCTION OF ANGSO DUO BRIDGE

  • 16th October 2014 GMT+7
CONSTRUCTION OF ANGSO DUO BRIDGE
The workers continue the workmanship of the Angso Duo Pedestrian Bridge near the East Jambi mini base, Jambi, Thursday (16/10). The construction of the bridge above the River of the Rodhari, which was targeted finished October 2014 was predicted by molor, but the construction of the floor was estimated to be connected in the next 7 days. ANTARA PHOTO/Wahdi Septiawan/Asf/ama/14.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3000x1759
File size
1.37 MB
Created
16/10/2014 21:15 WIB
Photographer
Wahdi Septiawan
Editor