ACEH TRAFFIC TREATMENT

  • 7th November 2014 WIB
ACEH TRAFFIC TREATMENT
Heavy equipment moves mud and longsor material covering the south west crossroad (barsel) Aceh in Gunung Paro, Aceh Besar, Aceh, Friday (7/11). The crossing that connects the provincial capital of Aceh with eight districts / cities on the south west coast of Aceh returned normal with the open-close system after a total disconnect for two days due to the longsor in the Paro mountain and Gequee. ANTARA PHOTO/Irwansyah Putra/Rei/Spt/14.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x2000
File size
1.76 MB
Created
07/11/2014 16:20 WIB
Photographer
Irwansyah Putra
Editor