TERMINAL CONSEP GREEN PORT
Shooting from the air condition of Lamong Bay Terminal, Surabaya, Friday (14/11). The Green Port-concepted Lamong Bay Terminal is built gradually and is targeted to be completed entirely at 2030 with a capacity of 5,5 million TEU container shelter and 20 million tons dry bulk. ANTARA PHOTO/Eric Ireng/s/ama/14
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.