REPAIR DRAINAGE CANDI DRILLOBUDUR

  • 18th November 2014 GMT+7
REPAIR DRAINAGE CANDI DRILLOBUDUR
Workers complete the drainage repair work (water channel) in the north hallway of Borobudur temple in the Complex of Borobudur Temple Tourism Park (TWCB) Magelang, Jateng, Monday(17/11). The drainage repair aims to smooth the drain of water inside the temple so that it does not bridge through the stone side that can result in the weather. ANTARA PHOTO/Anis Efizudin/s/pd/14

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3000x1993
File size
530.95 KB
Created
18/11/2014 12:35 WIB
Photographer
Anis Efizudin
Editor