ACEH CENTER TRAFFIC
Heavy equipment is used to clean mud and material that cover the closed road body of the stake in the Takengon-Blangkeujereun track, Central Aceh, Aceh, Saturday (22/11). The large and small longsor point in the track that connects the Central Aceh Regency and Gayo Lues it results in a 51-hour lump transport line. ANTARA PHOTO/Irwansyah Putra/Asf/Spt/14.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.