ACEH CENTER TRAFFIC

  • 23rd November 2014 GMT+7
ACEH CENTER TRAFFIC
Heavy equipment is used to clean mud and material that cover the closed road body of the stake in the Takengon-Blangkeujereun track, Central Aceh, Aceh, Saturday (22/11). The large and small longsor point in the track that connects the Central Aceh Regency and Gayo Lues it results in a 51-hour lump transport line. ANTARA PHOTO/Irwansyah Putra/Asf/Spt/14.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x2000
File size
3.03 MB
Created
23/11/2014 16:10 WIB
Photographer
Irwansyah Putra
Editor