HYDRO MINI POWER PLANT

  • 9th December 2014 WIB
HYDRO MINI POWER PLANT
Worker conducts turbine installation in Hydro Mini Power Plant (PLTMH) Fresha in Bentek Village, Gondang, North Lombok, NTB, Monday (8/12). This nuclear PLTMH has three units of plant turbines that have been operating and one unit in the construction process with a total installed capacity of seven MW to support the power resistance of PLN in the NTB region. ANTARA PHOTO/Widodo S. Jusuf/Rei/nz/14.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x1997
File size
1.09 MB
Created
09/12/2014 10:25 WIB
Photographer
Widodo S. Jusuf
Editor