HYDRO MINI POWER PLANT
The officer checked the high discharge water from Kali Segara who headed the turbine space of the Mini Hydro Power Plant (PLTMH) Fresha in the Water Bend in Bentek Village, Gondang, North Lombok, NTB, Monday (8/12). This nuclear PLTMH has three units of plant turbines that have been operating and one unit in the construction process with a total installed capacity of seven MW to support the power resistance of PLN in the NTB region. ANTARA PHOTO/Widodo S. Jusuf/Rei/nz/14.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.