LOADING TEST BRIDGE SIAK III
A total of 15 trucks are arranged above the bridge at the time of loading the Siak III bridge test in Pekanbaru, Riau, Saturday (20/12). Loading test using 15 trucks that have a load weighing 300 tons is done to find out the results of load test and bridge feasibility after the repair process because there is a arch on the side of the bridge floor that does not suit the construction of the bridge planning. ANTARA PHOTO/Rony Muharrman/Asf/pd/14.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.