LOADING TEST BRIDGE SIAK III
The workers of the construction team compose the truck row above the bridge at the time of loading the Siak III bridge test in Pekanbaru, Riau, Saturday (20/12). Loading test using 15 trucks that have a load weighing 300 tons is done to find out the results of load test and bridge feasibility after the repair process because there is a arch on the side of the bridge floor that does not suit the construction of the bridge planning. ANTARA PHOTO/Rony Muharrman/Asf/pd/14.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.