INDUSTRIAL GAS STABILIZATION
Two workers check the gas pipeline metering device at PT Pertagas Niaga Station, Wunut, Sidoarjo Drive, Thursday (12/2). PT Dharma Pratama Sejati (DPS), guarantees the stable gas supply of 20 MMSCFD in the Ngoro Industrial Park (NIP) Mojokerto industrial area, through pipes sized up to 8 inchi and relying on the supply of the same working Contractor gas well (K3S) in Jatim region. ANTARA PHOTO/Eric Ireng/Rei/ama/15.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.