RFCC DEVELOPMENT REVIEW
Recruited PT. Pertamina Dwi Soetjipto (second supply), observe the process of raw oil processing in the RFCC RU IV Lomanis control room, Cilacap, Jateng, Friday (20/2). Catalytic Cracking Fluid Residual Project (RFCC) in the Cilacap refinery complex, will begin to start up on March 2015 and full operation on June 2015 so that in August 2015 RFCC has been able to assist its operations to Pertamina. ANTARAFOTO/Idhad Zakaria/Koz/ama/15.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.