ELECTRICAL SPLICING PDKB SYSTEM

  • 9th March 2015 GMT+7
ELECTRICAL SPLICING PDKB SYSTEM
The workers connect the electrical network using the Connecting System In the Holding Procurement (PDKB) the Positive transmission line is 20.000VA in Sigi, Central Sulawesi, Monday (9/3). The PDKB system is used to minimize losses due to electrical outages due to the workmanship of electrical channels. ANTARA PHOTO/Basri Marzuki/Rei/pd/15.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3500x2325
File size
1006.28 KB
Created
09/03/2015 14:30 WIB
Photographer
Basri Marzuki
Editor