FIRST POLE DESIGN PLTU JENNEPONTO II

  • 19th March 2015 GMT+7
FIRST POLE DESIGN PLTU JENNEPONTO II
Menko Maritim Indroyono Soesilo (left quarter) along the Minister of ESDM Sudirman Said (left three), South Sulawesi Governor Syahrul Yasin Limpo (second left), Founder Bosowa Aksa Mahmud (right quarter), President Director Director of Zhejiang Thermal Power Countruction Mr. Yu Ceng Li, and CEO Bosowa Erwin Aksa (right) diluted the button starting the first pole of the PLTU Jeneponto Phase II in the Jenneponto Regency, South Sulawesi, Thursday (19/3). Bosowa Energy will build Steam Power Generation (PLTU) with 2 x 125 Mega Watt capacities with Rp3 trillion budget. ANTARA PHOTO/Yusran Uccang/s/mes/15

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3094x1872
File size
1.85 MB
Created
19/03/2015 19:05 WIB
Photographer
Yusran Uccang
Editor