PRIME CRUDE OIL LIFTING

  • 12th April 2015 GMT+7
PRIME CRUDE OIL LIFTING
Minister of ESDM Sudirman Said (second left) accompanied by President Director and CEO of Pertamina Dwi Soetjipto (left), member of the Commission VII DPR Satya Yudha (right) combined with the President of EMCL Jon M. Gibs (second right) in the launch of the main oil lifting of Banyu Urip block Cepu in Surabaya, East Java, Sunday (12/4). The initial crude oil lifting is an important capaian in the Banyu Urip Block Cepu field project integrating all the finished production components were built before, namely the line of the ground pipe for 72 km, the line of the sea pipe along 23 km and also the tambat tower as well as "Floating Storage and Offloading" (FSO) located in the sea of Java. ANTARA PHOTO/M Risyal Hidayat/Asf/Spt/15.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3508x2208
File size
1.97 MB
Created
12/04/2015 15:40 WIB
Photographer
M Risyal Hidayat
Editor