AIRPORT RAILWAY LINE CONSTRUCTION FACILITY SOETTA-

  • 20th April 2015 WIB
AIRPORT RAILWAY LINE CONSTRUCTION FACILITY SOETTA-
Director of PT Bank Central Asia Tbk (BCA) Suwignyo Budiman (right), Finance Director of PT Kereta Api Indonesia (KAI) Kurniadi Atmosasmito (center) and President Director of PT Railink Heru Kuswanto (left) signed the cooperation script of the credit facility indication of the construction project of Soekarno-Hatta Airport (Soetta) along approximately 12 KM, in Jakarta Monday (20/4). BCA with 3 other banks gives a credit worth Rp 1.449.096.152,000 or 84 percent of the total infrastructure development budget to PT KAI. ANTARA PHOTO/ho/Niar/ama/15

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
2388x1551
File size
325.57 KB
Created
20/04/2015 14:55 WIB
Photographer
Niar
Editor