PLTU DEVELOPMENT
GERUNG, 1/12 - BUILDING ENERGY. A number of heavy vehicles dredging land to take land that will be used on the manufacture of roads to the location of PLTU in Dusun Jeranjang, Ayu Garden Village, West Lombok, NTB, Monday (1/12). The construction of the PLTU with a power of 2 times 25 Mewawatt began to be carried out by drilling a number of points in the sea and land. ANTARA/Budi Afandi/mes/08
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.