CONSTRUCTION OF SCALED PORT

  • 23rd July 2015 WIB
CONSTRUCTION OF SCALED PORT
Some citizens are in the construction location of the dock port of the ship ro-ro (roll on roll off) Parit 7 Tungkal Hilir scaled at Tanjung Jabung Barat, Jambi, Thursday (23/7). The construction of ports in East Sumatra Beach is planned as a connecting means of the Indonesian marine economy activity with Malaysia, Singapore, and Thailand which began in 2003 was scaled since 2012 and due to the termination of APBN funds. ANTARA PHOTO/Wahdi Septiawan/s/aww/15.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x1993
File size
1.83 MB
Created
23/07/2015 17:15 WIB
Photographer
Wahdi Septiawan
Editor