A SURO
GRESIK, 28/12- SEMBURAN. A number of officers, sitting besides the blower that serves to decompose gas in the well of Lengowangi 2 managed Joint Operating Body (JOB) Pertamina-Petrochina East Java in Sekarkurung Village, Kebomas District, Gresik, East Java, Sunday (28/12). The mud bursts come back in the 2nd well, the smelting height reaches 40 cm, but the current pressure undergoes a decrease from 50 psi to 28 psi, today the drilling process reaches 1850 feet (600 meters) from the target 4000 feet (1300 meters) and leakage occurs in 960 feet thighs. ANTARA/Syaiful Arif/mes/08
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.