ELECTRIC PRODUCTION OF PLATA PLUG

  • 10th August 2015 GMT+7
ELECTRIC PRODUCTION OF PLATA PLUG
The officer controls the operation of the turbine engine in the complex of Indonesia Power Sub Unit of Water Power Plant (PLTA) Jelok, Semarang District, Jateng, Monday (10/8). The last month during the dry, the Jelok PLTA experienced a decrease in electricity production of about 75 percent and only operates one of the four turbine machines. ANTARA PHOTO/Aditya Pradana Putra/Spt/15.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3000x1820
File size
417.31 KB
Created
10/08/2015 16:30 WIB
Photographer
Aditya Pradana Putra
Editor