FIRST ULUBELU CLUSTER

  • 17th August 2015 WIB
FIRST ULUBELU CLUSTER
Director of PT Pertamina (Persero) Natural Syamsu (right) along Dirut Pertamina Geothermal Energy Irfan Zainuddin (kiori) reviewed the location of the incorporation drilling operator inaugurated the first step in the cluster K of the Geothermal Energy Ulubelu, Tanggamus, Lampung, Monday (17/8). With the inaugurated project 3 and 4 units will add the installed capacity to 220 Megawatt from 2x55 Megawat. ANTARA PHOTO/Hafidz Mubarak A./ama/15

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x2003
File size
1.22 MB
Created
17/08/2015 15:10 WIB
Photographer
Hafidz Mubarak A.
Editor