FIRST ULUBELU CLUSTER

  • 17th August 2015 GMT+7
FIRST ULUBELU CLUSTER
Worker controls the first inauguration in cluster K the geothermal Energy Ulubelu drilling location, Tanggamus, Lampung, Monday (17/8). With the inaugurated project 3 and 4 units will add the installed capacity to 220 Megawatt from 2x55 Megawat. ANTARA PHOTO/Hafidz Mubarak A./ama/15

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x2003
File size
1.22 MB
Created
17/08/2015 15:10 WIB
Photographer
Hafidz Mubarak A.
Editor