FIRST ULUBELU CLUSTER
The Director of PT Pertamina (Persero) Natural Syamsu (center) along the Dirut Pertamina Geothermal Energy Irfan Zainuddin (second left) is paired near the bow drilling tool inaugurating the first step in cluster K the geothermal Energy Ulubelu drilling location, Tanggamus, Lampung, Monday (17/8). With the inaugurated project 3 and 4 units will add the installed capacity to 220 Megawatt from 2x55 Megawat. ANTARA PHOTO/Hafidz Mubarak A./ama/15
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.