FIRST ULUBELU CLUSTER

  • 17th August 2015 GMT+7
FIRST ULUBELU CLUSTER
The Director of PT Pertamina (Persero) Natural Syamsu (center) along the Dirut Pertamina Geothermal Energy Irfan Zainuddin (second left) is paired near the bow drilling tool inaugurating the first step in cluster K the geothermal Energy Ulubelu drilling location, Tanggamus, Lampung, Monday (17/8). With the inaugurated project 3 and 4 units will add the installed capacity to 220 Megawatt from 2x55 Megawat. ANTARA PHOTO/Hafidz Mubarak A./ama/15

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x2003
File size
1.32 MB
Created
17/08/2015 15:10 WIB
Photographer
Hafidz Mubarak A.
Editor