FIRST ULUBELU CLUSTER
Director of PT Pertamina (Persero) Natural Syamsu (left) along Dirut Pertamina Geothermal Energy Irfan Zainuddin (second left) reviewing the location of drilling the intestinal inaugurating the first step in the cluster K of drilling site Pertamina Geothermal Energy Ulu, Tanggamus, Lampung, Monday (17/8). With the inaugurated project 3 and 4 units will add the installed capacity to 220 Megawatt from 2x55 Megawat. ANTARA PHOTO/Hafidz Mubarak A./ama/15
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.