RFCC OPERATION PREPARATION
PT. Pertamina Persero Rachmad Hardadi (second left) review the construction of processing facilities from 'rooftop' Residuel Fluid Catalytic Craker (RFCC) in the Pertamina complex area RU IV Lomanis, Cilacap, Jateng, Monday (14/9). The RFCC processing facilities are in the preparation and checking of facilities to operate in early October. The facility has a capacity of processing 62 thousand barrel crude oil per day. ANTARA PHOTO/Idhad Zakaria/kye/15.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.