CILIWUNG CALIPER INSTALLATION

  • 13th October 2015 WIB
CILIWUNG CALIPER INSTALLATION
Worker conducts the workmanship of drill bits for tours in Ciliwung River bans in Kalibata Area, Jakarta, Tuesday (13/10). The normalization project aims to return the width of the Ciliwung River to the normal condition of 35-50 meters, confusion, embankment, and increase the capacity of water tampung from 200 cubic meters perdetic into 570 cubic meters perdetic and the normalization of the time to anticipate the flood in the rainy season. ANTARA PHOTO/Reno Esnir/nz/15.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
2246x3000
File size
1.84 MB
Created
13/10/2015 17:00 WIB
Photographer
Reno Esnir
Editor