PLTU
The vehicle crosses next to the complex of Steam Power Generation (PLTU) Paiton, Probolinggo, East Java, Monday (26/10). PLTU Paiton operates 3 PLTU which strengthens the Java-Bali electricity system of 29.231 MW, while the peak load is 19.700 MW, so the surplus 9.531 MW. ANTARA PHOTO/Moch Asim/pd/15
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.