FIRST PRODUCTION OF THE GASTRIC PETRONAS JATIM

  • 4 November 2015 16:50 WIB
FIRST PRODUCTION OF THE GASTRIC PETRONAS JATIM
Director General of Oil and Gas Kementrian ESDM IG Nyoman Wiratmaja Puja (right three), Head SKK Migas Amin Sunaryadi (second right), Vice President of Production International Petronas Chen Kah Seong (right) and General Manager of Petronas Indonesia, Hazli Sham Kassim (second left) as well as other Petronas officials press the button along when the First Production Dream of Oil and Old Hill Gas and Kepodang in the Land Revenue Facility of Petronas, Gresik, East Java, Wednesday (4/11). The two mythical fields located in the north sea and off the East Java coast can produce up to 20,000 barrels of oil per day (bopd) and 50 million standard cubic feet of gas per day (mmscfd) expected to contribute in meeting the demand of energy in Indonesia. ANTARA PHOTO/Zabur Karu/ama/15

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3500x2271
File size
1.41 MB
Created
04/11/2015 16:50 WIB
Photographer
Zabur Karuru
Editor