CONSTRUCTION PORT GILI MAS

  • 4th November 2015 GMT+7
CONSTRUCTION PORT GILI MAS
Members of the DPR Commission VI Party Movement of Indonesia Raya (Gerindra), Bambang Haryo Soekartono (right) accompanied by General Manager Pelindo III Branch Sheet, Baharuddin (left) reviewing the location of the construction of Gili Mas harbor in Sheet, Gerung, West Lombok, NTB, Wednesday (4/11). The Gili Mas port is built next to the west of the Sheet Port with a dermaga length of 1.250 meters and the depth of the 20-meter labyuh pool can accommodate the targeted tanker and cruise ship can operate in 2017. ANTARA PHOTO/Ahmad Subaidi/ama/15.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3048x1981
File size
1.5 MB
Created
04/11/2015 17:50 WIB
Photographer
Ahmad Subaidi
Editor