GEOTHERMAL POWER PLANT

  • 4th November 2015 GMT+7
GEOTHERMAL POWER PLANT
A employee checks air condition using multigas detector at the location of the hotbumi power plant (PLTP) at Chevron Geothermal Salak, Sukabumi, West Java, Wednesday (4/11). Chevron Geothermal The world’s largest sixth largest sequence with 76 production wells that generate electricity by 377 Megawatt (MW). ANTARA PHOTO/Budiyanto/ama/15

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3717x2361
File size
667.45 KB
Created
04/11/2015 18:45 WIB
Photographer
Budiyanto
Editor