RAILWAY REJUVENATION

  • 9th November 2015 GMT+7
RAILWAY REJUVENATION
Workers replace R38 type rails with R54 type in Garum area, Blitar, TImur, Monday (9/11) early days. The 48 kilometers or 40.800 M'sp (septic diameter) is expected to take more than 30 days because it is only done at night so that it does not interfere with the railway traffic. ANTARA PHOTO/RFID Anshori/kye/15

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3200x2133
File size
1.7 MB
Created
09/11/2015 10:00 WIB
Photographer
Irfan Anshori
Editor