COMAL RIVER CONCRETE EMBANKMENT

  • 4th December 2015 GMT+7
COMAL RIVER CONCRETE EMBANKMENT
A number of workers complete the construction of concrete embankments in the Comal River, the Cross, Central Java, Friday (4/12). The construction of concrete embankment along 627 meters of the Comal river by the Ministry of Public Works (PU) and the Great Hall of the Divine River with the cost of APBN at Rp24 billion for flood control, longsor anticipation and inhibiting and stabilizing the river flow is targeted completed in mid December. ANTARA PHOTO/Oky Lukmansyah/nz/15

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3600x2383
File size
1.45 MB
Created
04/12/2015 17:15 WIB
Photographer
Oky Lukmansyah
Editor