DEVELOPMENT OF WHITE RED BRIDGE
The workers are contemplated the end stage of the White Red Bridge in Ambon, Maluku, Friday (4/12). The targeted bridge was completed January 2016 it has a total length of 1.140 meters connecting the village of Galala, Sirimau District and Poka Village, Ambon Bay District, Ambon City. The height of this bridge reaches 34.1 meters above sea level. ANTARA PHOTO/izaac mulyawan/nz/15.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.