PETROLEUM HEAT ENERGY PRODUCTION

  • 14th December 2015 GMT+7
PETROLEUM HEAT ENERGY PRODUCTION
The officer examined the geothermal energy production facility in Cluster D production well PT. Pertamina Geothermal Energy Area Ulubelu, Lampung, Monday (14/12). This production facility is able to supply the electricity requirements of 110 MegaWatt and is currently targeting to meet more than 20 percent of electricity needs in Lampung. ANTARA PHOTO/Reno Esnir/ama/15.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x2000
File size
1.36 MB
Created
14/12/2015 19:55 WIB
Photographer
Reno Esnir
Editor