REPAIR OF FLOODED RAILWAY RAILS

  • 12th February 2016 WIB
REPAIR OF FLOODED RAILWAY RAILS
PT Kereta Api Indonesia (KAI) Operational Area (Daops) VIII Surabaya repairs pi train rails using Profile Ballast Regulator (PBR) railway in Porong, Sidoarjo, East Java, Friday (12/2). The repair to fix the flooded railway rails at a height of reaching 70 cm. ANTARA PHOTO/Umarul Faruq/aww/16.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3200x2135
File size
1.28 MB
Created
12/02/2016 19:25 WIB
Photographer
Umarul Faruq
Editor