CONSTRUCTION ROAD EXPORT RESULTS PETROLEUM GAYO

  • 3rd March 2016 GMT+7
CONSTRUCTION ROAD EXPORT RESULTS PETROLEUM GAYO
The rider passes through the crossroads of the Aceh Kraf Paper (KKA) to Bener Meriah who began to be blanketed in the Nisam Between Guci Nisam, North Aceh, Aceh Province. Wednesday (2/3). The opening of the road along 113 kilo of North Aceh KKA traffic meters - Bener Meriah (which is almost rampant done the asphalt) takes only 1.5 hours for the distance of Bireuen-Bener Meriah takes about 4 hours, to make it easier for tourists and transport the results of the earth from Bener Meriah and Central Aceh, such as Gayo coffee, potatoes and lime vegetables are exported directly through the port of Krueng Guekueh. ANTARA PHOTO/Rahmad/pd/16

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3000x4500
File size
1.29 MB
Created
03/03/2016 13:45 WIB
Photographer
Rahmad
Editor