WHITE RED BRIDGE LOAD TEST
A number of vehicles are preparing to follow the load test conducted by Bridge Security Commission and the Tunnel of the Ministry of Public Works in the White Red Bridge, Ambon, Maluku, Thursday (3/3). Testing is carried out against 1,06 kilometers of bridge to know the feasibility in holding loads, as a mandatory procedure is operated as public facilities. ANTARAFOTO/izaac mulyawan/aww/16.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.