RIVEROHIGH BRIDGE CONSTRUCTION

  • 18th March 2016 GMT+7
RIVEROHIGH BRIDGE CONSTRUCTION
Workers complete the construction of the Higho river bridge located in the roadside of Toll Hot Reform IV, Makassar, South Sulawesi, Friday (18/3). The bridge project with a length of 208 meters and a width of 18.6 meters is part of the development of the integrated economic area of Maminasata (Makassar, Maros, Sungguminasa, and Takalar) and is planned to be completed in May 2016. ANTARA PHOTO/Dewi Fajriani/pras/16

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
4928x3264
File size
1.64 MB
Created
18/03/2016 19:40 WIB
Photographer
Dewi Fajriani
Editor