SHIP REPAIR ABOVE 30 GT
A number of workers complete the ship repair over 30 Gross Tonnage (GT) at Tegal Port, Central Java, Monday (21/3). The repair of the body and the fishing boat engine above 30 GT takes six months at the cost of reaching Rp200 million. ANTARA PHOTO/Oky Lukmansyah/16
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.