STAGE CONSTRUCTION PLTU ROD

  • 24th March 2016 GMT+7
STAGE CONSTRUCTION PLTU ROD
President Director of PT Bhimasena Power Indonesia (BPI) Mohammad Effendi (left three), Deputy Bupati Rod Soetadi (left quarter), and Manager of PT PLN Pekalongan Djoko Tri Harstjarjo (second left) conducts the installation of the last panel the sign began the construction stage of the Steam Power Plant (PLTU) Rod at Ujung Negoro, Rod Regency, Central Java, Thursday (24/3). The construction of PLTU which is the cooperation of the government and private (PT BPI) with a capacity of 2 x 1,000 megawatts (MW) has been completed by conducting 226 hectares of land procurement and targeted can be operated in 2020 to supply national power requirements. ANTARA PHOTO/Aditya Pradana Putra/ama/16.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3000x2030
File size
569.22 KB
Created
24/03/2016 13:10 WIB
Photographer
Aditya Pradana Putra
Editor