TECHNICAL OBSTACLE PLTS DARUBA
Minister of ESDM Sudirman Said (second left) checks the power supply of solar power generation (PLTS) Daruba, Morotai Island District, North Maluku, Wednesday (6/4). The PLTS is the largest panel in North Maluku, utilizing solar energy into electrical energy through photovoltaic module (green energy), a capacity of 600 kWp, built in 2012 but now only 2/3 of the system that functions and is manually operated to be converted with PLTD and is only guarded by one technician. ANTARA PHOTO/Yudhi Mahatma/pd/16
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.