CONSTRUCTION OF BAWEN-SALATIGA TOLL BRIDGE
A number of workers built the construction of the Tol Bawen-Salatiga bridge support pole between the hills in Tuntang, Semarang Regency, Central Java, Wednesday (27/4). Toll along the 17.5 kilometers targeted finished on the 2016 Width has two bridges being built, among other Tuntang Bridges in the Delik Village, Tuntang with 370 meters long and Pabelan Bridge in Sukoharjo Village, Pabelan, with 170 meters long. ANTARA PHOTO/Aditya Pradana Putra/foc/16.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.