HAIRY MATURE
BANGKALAN,1/4 - SURAMADU SISI MADURA. The camp of workers completed the mega Suramadu Bridge project (Surabaya-Madura) from Madura side, in Sukolilo Village, Labang, Bangkalan, Mature, Jatim, Wednesday (1/4). After the next connected bridge is the work of the bridge floor, asphalting, ceramic arrangement and scheduled will operate July 2009. PHOTOS/Saiful Bahri/s/nz/09
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.